- Joined
- 6 Dec 2004
- Messages
- 17
- Reaction score
- 0
- Country
I'm used to plonking down harboard over floor boards for a sticky tile overlay.
What should I use as an undelay for a laminate floor, when the base is quarry tiles on one part of the floor, which stop at a line, and becomes a concrete floor surface?
cheers,
Rick
What should I use as an undelay for a laminate floor, when the base is quarry tiles on one part of the floor, which stop at a line, and becomes a concrete floor surface?
cheers,
Rick