Maximum time from priming to tiling......is there one?

Joined
14 Jul 2014
Messages
121
Reaction score
2
Location
Yorkshire
Country
United Kingdom
Hi

Is there a maximum time between priming with BAL acrylic primer and actually tiling the walls?

I primed the walls on Sunday intending to tile once dry but other things cropped up and didn't get around to it.

If I didn't tile until next Sunday, would I need to give the walls another coat of primer (already had two coats neat)?

Cheers
 
Sponsored Links
Sponsored Links
Top