Hi all.
Im having 2.8 meter high x 6 meter wide aliminum sliding doors fitted.
At the moment the opening hight is 2.91high.
Basically I need to raise the area were the bottom track will seat by 110mm,
I will take the finished level out into the gardem about a meter,
So area to fill will be 6m long 1 meter wide, it needs to be stong to take the weight of the doors glass etc.
Advice needed on the best way to lay this slab please.
Exsiting floor is a solid slab, not sure how thick tho.
Nb doors being fitted in 6 weeks, drying time of a 110mm slab ?
Im having 2.8 meter high x 6 meter wide aliminum sliding doors fitted.
At the moment the opening hight is 2.91high.
Basically I need to raise the area were the bottom track will seat by 110mm,
I will take the finished level out into the gardem about a meter,
So area to fill will be 6m long 1 meter wide, it needs to be stong to take the weight of the doors glass etc.
Advice needed on the best way to lay this slab please.
Exsiting floor is a solid slab, not sure how thick tho.
Nb doors being fitted in 6 weeks, drying time of a 110mm slab ?