Starting foundations, what Final height?

Discussion in 'Building' started by Mr Chibs, 10 Oct 2021.

  1. Mr Chibs

    Mr Chibs

    Joined:
    28 Jul 2015
    Messages:
    882
    Thanks Received:
    152
    Country:
    United Kingdom
    Morning all.

    I’ll be helping a mate who has decided to build his own extension.

    Mate’s intention is to fill the trench (dug already) to cut down on block work.
    He’s mentioned laying trench blocks to start with, and continuing up with block work.

    How do you work out What will be the correct height for the foundations to finish at?


    Tia
     
  2. Sponsored Links
  3. noseall

    noseall

    Joined:
    2 Feb 2006
    Messages:
    42,913
    Thanks Received:
    2,657
    Location:
    Staffordshire
    Country:
    United Kingdom
    You look at the existing DPC level and work down from there. If you are re-building in metric and the existing is imperial, ignore their coursing and set yours accordingly.

    An Ideal measurement down from DPC to top of concrete would be say 525mm. This allows bottle gullies to sit without having to mess about with the concrete and also means that you can be left with a single course of bricks on the inner skin (525mm works two courses of block and one of brick on the internal skin). This single course of bricks becomes a boon when dealing with the floor screed later on.

    If you want to be really tight and the site is nice and level, you can get away with having the concrete higher i.e. 450mm down from DPC, but its slightly more risky.
     
    Last edited: 10 Oct 2021
    • Thanks Thanks x 1
  4. Mr Chibs

    Mr Chibs

    Joined:
    28 Jul 2015
    Messages:
    882
    Thanks Received:
    152
    Country:
    United Kingdom
    Much appreciated for the detailed reply.

    Mate, can be a bit slap dash, and it’s been worrying me, that we start wrong and it’ll be a battle the whole way up.

    Any other nuggets shared are appreciated (y)
     
  5. noseall

    noseall

    Joined:
    2 Feb 2006
    Messages:
    42,913
    Thanks Received:
    2,657
    Location:
    Staffordshire
    Country:
    United Kingdom
    Just to add: Some existing brickwork/floor levels are far from being level themselves. Always look at where you are going to be doing the knock through etc and where you will be coursing up against the house, when deciding where to measure from.
     
    • Thanks Thanks x 1
  6. thomp1983

    thomp1983

    Joined:
    25 Aug 2016
    Messages:
    259
    Thanks Received:
    30
    Country:
    United Kingdom
    As noseall has said, you need to carefully check the existing coursing, our 1970's house lost a whole brick over 12 courses and as such the new extension doesn't line up, fortunately we've managed to lose the obvious joins behind drain pipes
     
    • Thanks Thanks x 2
  7. Sponsored Links
  8. Mr Chibs

    Mr Chibs

    Joined:
    28 Jul 2015
    Messages:
    882
    Thanks Received:
    152
    Country:
    United Kingdom
    Another question if I may.

    Inspector has been out, and asked for rods/bars to be drilled into existing foundations and left protruding, to be encased in the new pour.

    Is this standard practice, as it was a new one on me?

    He said it was ok to resin in... was thinking drilling 200mm deep (400mm total bar length)

    Thanks
     
  9. ^woody^

    ^woody^

    Joined:
    3 Sep 2006
    Messages:
    33,583
    Thanks Received:
    4,563
    Location:
    West Mids
    Country:
    United Kingdom
    Has the inspector just left Uni?
     
  10. Mr Chibs

    Mr Chibs

    Joined:
    28 Jul 2015
    Messages:
    882
    Thanks Received:
    152
    Country:
    United Kingdom
    Take it that’s a no then :D
     
  11. noseall

    noseall

    Joined:
    2 Feb 2006
    Messages:
    42,913
    Thanks Received:
    2,657
    Location:
    Staffordshire
    Country:
    United Kingdom
    I've been asked to underpin existing (shallower foundations), in particular if there is a point load (steel beam etc) being fitted above, later on.
     
  12. Mobo_14

    Mobo_14

    Joined:
    5 Jun 2019
    Messages:
    134
    Thanks Received:
    26
    Country:
    United Kingdom
    Been asked to do this alot lately even when the foundation was 400mm below ground level and a slab of 150 year old sandstone.

    just take a photo of it to pacify them if they ever ask about it…..which I doubt they will.
     