Got some time off work, and decided to upgrade my old Wylex rewirable fuse board, for a Wylex dual RCD unit (on special at Screwfix)
I have spent today going around assessing and testing the circuits I have in my house, and plan to change the board tomorow
My question is I'm unsure which circuits to group together on the two RCD's (80A and 63A)
My circuits will be:
1x 32A Ring final circuit - upstairs and downstairs sockets-including kitchen (microvave, kettle, small fridge)
1x 32A Ring final circuit - laundry room (washer and T-dryer)
1x 6A lighting -upstairs
1x 6A lighting -downstairs
1x 16A radial - outdoor shed (occasional power tool use, lawnmower etc)
1x 16A radial - extension (PC, small chest freezer)
1x 40A radial (8kW shower)
1x 6A radial (gas combi-boiler)
1x 16A radial to pantry (1xfridge freezer)
Cooking on gas!
I will split the lights, naturally, but how would you split the other loads up?
Many Thanks
I have spent today going around assessing and testing the circuits I have in my house, and plan to change the board tomorow
My question is I'm unsure which circuits to group together on the two RCD's (80A and 63A)
My circuits will be:
1x 32A Ring final circuit - upstairs and downstairs sockets-including kitchen (microvave, kettle, small fridge)
1x 32A Ring final circuit - laundry room (washer and T-dryer)
1x 6A lighting -upstairs
1x 6A lighting -downstairs
1x 16A radial - outdoor shed (occasional power tool use, lawnmower etc)
1x 16A radial - extension (PC, small chest freezer)
1x 40A radial (8kW shower)
1x 6A radial (gas combi-boiler)
1x 16A radial to pantry (1xfridge freezer)
Cooking on gas!
I will split the lights, naturally, but how would you split the other loads up?
Many Thanks