Were do you stand legally if you install your cables 1st fix in the required zones, and then later before they are plastered a plumber moves them to accomodate there pipes and there are no longer in the zones, but you know nothing of this. Then they get plastered hiding everything. If someone drills through them and blames you for not having them in the right zones?