Have dug out the hearth in front of my (bricked in) fireplace as it was not needed and bridging the dpc.
I have dug down to bare mud (approx 8" below the floor joists). The rest of the sub floor is bone dry concrete. The mud is about 4" above this. I want to concrete over the hearth like the...