Good Idea :wink:
another good idea :wink:
Really bad idea :shock: With the power still off trace the cable back and try to disconnect it and remove it completely. If thats not possible, cut it off either in the loft or under the floor boards and terminate it into some kind of junction...
I'm doing an extension of my own and I'm not sure about the rules for mounting heights for sockets and switches. I am a spark so PP is sorted.
If I do it as per the regs and class the installation as an extension to existing I can mount the sockets and switches at the same height as the rest...
Hi guys.
I want to install a 3 zone controller, 1 heating, 1 HWS and 1 for a pool which is on a control valve feeding a heat exchanger. Can anyone tell me if they know of one or will I need to fit a second controller. I have looked at 4 channel time switches but they lack all the normal...