Recent content by dazzab

  1. D

    Log cabin base

    Hi all I am having a 5.5m x 4m log cabin placed in my garden upon the new ecobase system. I am stripping the top layer of turf but the area required is uneven. How do I go abouts making it even and strengthen the ground for this cabin. What should I use...sand?? topsoil???pea gravel??? The...
  2. D

    Composite door change

    I've been searching online for ages and cannot for the life of me find an answer to this dilemma. I currently have a composite door fitted to my home but has no glass in it and so make's my porch dark and dreary. I do not want to fork out the large amount of monies for the full composite door...
  3. D

    Extending on back of link detached garage

    Hi peeps, I have a link detached home which is joined to next doors home via my garage. ie: my home,garage,their home,garage. Is it possible to build on the back of my garage to make a room and leave the garage as a garage as the new extension would not then be touching any part of their...
  4. D

    monobloc leak

    tails are 15mm x 10mm. http://www.screwfix.com/prods/27936/Plumbing/Flexible-Hoses/Flexible-Tap-Tails-10mm-x-15mm-x-300mm-Pack-of-2 from screwfix. have now decided to buy new tap from wickes. many thanks for yr replies guys. darren
  5. D

    monobloc leak

    Hi all Real problems this end now. Monobloc tap leaks from the bottom of tap on bathroom basin where tailend goes in (hot water side). I went to screwfix and purchased 2 new tails and put them on and wholla.....happened again. Could it be a faulty tap. My system is pressured. I usually...
  6. D

    how to make a pipe carrier.

    :D lancenotalot ive heard about your tiling mate........paper mache for grout....oh come on!!!!! everyone knows ya use play doh in the chosen colour. :D
  7. D

    how to make a pipe carrier.

    i need a pipe carrier for my copper. cannot afford the proper ones. i heard you can make it from soil pipe but need to know the exact bits i need. many thanks guys and girls :D
  8. D

    annoyed customer

    cheers guys i had already been paid for the bathroom install fully. this request from her to me to fix shower was weeks later. after i had finished the install i told her boiler fault and get an engineer out .due to warm water only from taps and shower (working at time) all plumbing...
  9. D

    annoyed customer

    i have spoken about this subject before. i had a full bathroom install which included thermostatic shower which i piped into h & c supply pipes. customers house works on combi. week after install only warm water was coming through taps. i carried out extensive checks and plumbing was done...
  10. D

    poss boiler prob

    Kevplumb is right. customer wanted concealed fitting even after i reminded her about servicing. A chrome plate covers the main shower valve (cos it looks nice)and will not allow a good access hole or it would be visible. it has about 15mm gap round valve body. i have no choice but to remove...
  11. D

    poss boiler prob

    cheers kevplumb your a star :) thanks to all others also what a great site...i feel better now. once again a big thank you :D
  12. D

    poss boiler prob

    yes i will go round to clients house. thanks for all the replies guys. i will look at filters. but my question is....is it my fault that after 3 weeks the boiler sends crap through to the hot side of valve and blocks filters???? if the filter is blocked by boiler can i still charge...
  13. D

    poss boiler prob

    pipework was flushed out and shower working for 3 weeks. i have fitted many of these thermo shower valves and never had this problem.
  14. D

    poss boiler prob

    yes the shower had cold and warm water coming out of it the same as the rest of the taps in bathroom before this shower stopped. been a few weeks after install now. i have re advised her to get engineer out but she is still moaning that i am to rectify it. she also still states that...
Back
Top