Recent content by Gert_Lush

  1. G

    Socket Ringmain RCD isolation issue

    i thought that but when i flick the upstairs mcb, some sockets at the front of the house upstairs go dead, as do some at the back of the house downstairs...
  2. G

    Socket Ringmain RCD isolation issue

    If it is cross connected in the consumer unit, is it a simple job for a qualified sparky to rectify - if so, how long should i reasonably expect it to take?
  3. G

    Socket Ringmain RCD isolation issue

    I don't have an original EIC from when the house was built. I do have an installation certificate from when an electric shower was installed about 9 months ago though.
  4. G

    Socket Ringmain RCD isolation issue

    MCBs i mean! I thought there could be a cross connection in the fusebox, not sure how common that is...
  5. G

    Socket Ringmain RCD isolation issue

    Last night, i went to isolate an upstairs socket to replace the faceplate as it had cracked. I flicked the RCD marked 'Sockets Up' and the socket i was working on went dead as expected. However, some other sockets upstairs were still live as a stereo was still on, but a few sockets went dead...
  6. G

    Boiler cycling

    You are probably right - although can the output of a boiler to reduced (by a corgi tech or course)?
  7. G

    Boiler cycling

    That's job two... :) Any ideas on why its cycling though?
  8. G

    Boiler cycling

    I have a Glow Worm Ultimate 40 conventional boiler and a standard vented heating system. When the house is cold and the CH is switched on, the boiler will run as normal for about 20 mins, then cycle on for about 1 min then off for about 3 mins until eventually the room stat cuts the boiler...
  9. G

    Tiled in cooker switch???

    I recently had my kitchen tiled and the tiler tiled in the cooker switch as opposed to tiling just behind it. If the switch becomes defective, i would need to chip the tiles and grout off around it to remove it. Question is, is this workmanship in accordance with the building regs? Cheers...
  10. G

    Tiled in cooker switch???

    I recently had my kitchen tiled and the tiler tiled in the cooker switch as opposed to tiling just behind it. If the switch becomes defective, i would need to chip the tiles and grout off around it to remove it. Question is, is this workmanship in accordance with the building regs? Cheers
  11. G

    quick reply needed please folks...

    gasmarkone No one got zapped, i noticed that he had wired the pump in incorrectly, by which time, he was scrtaching his head trying to suss what was wrong, when i told him what he had done, he rectified it.
  12. G

    quick reply needed please folks...

    All copper pipes in my system... Lor: If it does not cause the whole system to go live, is this why the fuse/mcb did not pop?
  13. G

    Quick advice needed...

    Sure, it was brown wire to the earth connection and yellow/green to the live connection. There doesn't seem to be any harm done, although i will be getting the electrics checked since the fuse/MCB did not pop. Panic over, cheers for the advice.
  14. G

    quick reply needed please folks...

    No, the flex was standard blue, brown, green/yellow. The connections on the pump were clearly marked. The wiring was conventional. There doesn't seem to be any harm done to the system, so panic over hopefully!
  15. G

    Quick advice needed...

    Cheers A decent sparky is next on my phone call list to check out why nothing went poop when he did this. Thanks.
Back