Have a Euro combi A23 boiler but I can not reprogram the time clock any body have or know where I can get a instruction leaflet or talk me through the reprogramming
If there is no earth in your lighting circuit it means it was probably wired before 1966 and therefore should only have PVC switches and light fittings I would recommend rewiring the lighting circuit if not the whole installation