Recent content by gulp44

  1. G

    moving consumer unit

    1) lentgh off tails are 3mtrs size is 25mm2 2) existing service fuse rating 100a 3) lenghten cable what would you suggest is the best practice for that?
  2. G

    moving consumer unit

    thanks for replys, :D first of all the space would be to tight to fit additional CUs thanx B-A-Sheds:what size off switchfuse would be required? and yes the out going cables would have to be lenghtened As for the building warrant i dont know how would i check that out :?:
  3. G

    moving consumer unit

    Hi all, i looking the resite and upgrade my consumer unit at present its in a very small cupboard space, and i want to move it to the cupboard under the stairs which is a distance of 3mtrs. Does the mains and meter have to be moved or can this be done by fitting longer tails?
  4. G

    wiring for timer control unit to a compact HE vokera combi

    looking to wire lifestyle pt170 control unit/timer to my newly fitted vokera compact HE combi. there are 4 wires coming from the unit a live and neutral (red and a blue) which leaves a black and yellow wires, there is 64v across these two! can anyone shead anylight on this for me??? thanks ps...
  5. G

    wiring for timer control unit to a compact HE vokera combi

    have had a vokera (compact HE) combi boiler installed i need to wire temperture control unit and timer to it can anyone help please??????? have spoken to vokera tech department and was told that i could not conect a voltage unit to it is this correct????? if so what do i do???? please help my...
  6. G

    lighting

    thanks for the quick reply!! how do i isolate room? what is the proccess ????
  7. G

    lighting

    my lighting keeps tripping, what are the possible cause's and how would i fix it?
Back
Top