    Concrete base cracked, bitumen coating with parquet (1960s)

    Also just to add the ceiling height is 2460 from the concrete slab. Hallway flooring level (asbestos tiles under the carpet) is 20mm above the concrete. We were looking at the LoProx Max UFH heating system which gives a build up of 22mm.
  2. G

    Concrete base cracked, bitumen coating with parquet (1960s)

    Hi, looking for a bit of advice please regarding the flooring in our 1960s house. We moved in to our renovation project recently and we are looking to move the kitchen into a kitchen/diner room at the rear. After lifting the carpet/underlay in the room that will form the kitchen, we discovered...