Recent content by mhes

  1. M

    Gravity feed piping

    Thanks for the replies. I suppose if I try and engineer even a slight rise on the horizontal and use the immediate 1.5m rise to get the process moving with a continuous drop on the return AND the vent at the highest point ..... it might work!
  2. M

    Gravity feed piping

    Hi I am thinking of putting in a woodburning stove with a back boiler leading to a hot water tank. My problem is the tank position in relationship to the stove. It looks like I can either: 1) Have a 1.5 metre rise from the stove and then 7 metre horizontal run to the hot water tank. 2)...
Back
Top