Hi,
Firstly, apologies if this topic has already been answered.
We had an extension built about 12 years ago. The external wall was kept and not knockec down.
I am having a new kitchen installed and would like to knock down part of the wall (roughly 3 metres) to make one big open area...
Hi guys,
I have a 250L megaflo Indirect system, also a vailliant ecotec 630 boiler.
does any one know how long it takes to heat up the whole tank, also should the boiler send a message to the tank telling it to shut off once the water has reached the required temperature?