Fall from toilet pan to soil stack will be 1 in 23 or 40. No manhole yet. Septic tank to be installed.
Can i go from base of stack 90 bend straight into manhole
Hi all. Just a quicky.
I have a toilet up stairs the pipe comes straight out the wall.
Question 1. Can i have a turn to connect to the stack?
At the base of the stack i have a toilet that needs to join to it from the basement.
Question 2. It will join into it and then jave a bend directly below...
Hi everyone . I know thereis various info on this but i need specific info please help.
I need to move an earth rod that is in the mud floor of my basement.
I have read various info on cable size 16mm 25mm etc.
The local shop sells these bare with no inslulation.
So. I have1 phase 500ma...
Hi just a quick one. I am installing new soil pipe and it comes out the back of the toilet. I know there needs to be a fall on it. 1.23 or 1.40
The question is do i need to install an angled joiner or just tilt it in the fitting. Same for connection to soil stack.
T piece or angled joiner...