Existing ceramic tiled floor approx 7 years old souding hollow and some tiles have cracked. Existingsub floor is a solid concrete screed on concrete block and beam.
Decided to put a new floor down.
Started to lift old tiles which are coming up remarkably easy, light tap with...
Im in the process of installing a Catnic CN6XB 2850mm lintel for a clear span of 2550mm into a ground floor 100mm blockwork wall which only supports the first floor joists.
I intend to support the lintel using engineering bricks as a padstone at either end (minimum 150mm bearing).
Can...