Recent content by Tangowagon

  1. T

    Two electric showers, main fuse overload

    I have a client that wants two electric showers with a 60A main fuse. Obvious risk of blowing the main fuse. Options Just say no Do it but explain that both showers must not be used at the same time (good lucknon that one) As above but run both showers off one 45/50A breaker such that, if they...
  2. T

    Jetwash before painting over masonry "paint"

    Yes, I know that, but the damage is already done, ideally I would sandblast the whole building back to bare brick but as I said, this is not feasible.
  3. T

    Instant Hot Water

    One 3kw instant heater could feed two hand basins, if it is supplied by mains pressure, run the supplies to the basins in 10mm plastic microbore, the flow will be adequate and less volume in the pipe will mean less time to get hot water at the tap and less waste. I plumbed up 3 holiday cottages...
  4. T

    Jetwash before painting over masonry "paint"

    Hi guys, my latest renovation project is built from solid 9" Victorian brick that has been painted with brick red masonry paint, though it is quite thick and flexible where it is peeling off and I suspect it may be a "coating" rather than masonry paint (is there a difference?) As I say, it is...