I am planning to remove a 10 foot long internal plaster board wall. The ceiling boards run up to each side of the wall framing. What is the best way to cover the 4 inch gap which will be left in the ceiling once I take the frame down?
Thanks for the quick reply. The loft is covered with insulation and is partially covered with floorboards. I just wondered if there was a convention that was always followed. I will go investigate today in the loft :)