Recent content by tiredofdrama

  1. T

    Build over agreement

    @noseall so I rang the water board and they said they need the post drains survey but whether BC ask for it before sign off or not doesn't matter to them. BC hasn't asked for it
  2. T

    Build over agreement

    Private
  3. T

    Build over agreement

    Hi @jeds not sure how long the run is. It's says on the report it's about 900mm deep Should I wait for BC to sign off then write to them? Just waiting on a smoke alarm to be hardwired then the BC said he would sign it off. I rang the water board just anonymously asking a out the process of post...
  4. T

    Build over agreement

    Hi @SpecialK on the report it says manhole depth is 900mm not sure how many houses it connects to. I did ask the CCTV drainage guy he said I could find out but he didn't know exact number. So building inspector is about to signoff once hardwired smoke alarm is done and hasn't asked for the CCTV...
  5. T

    Build over agreement

    Yes I have and hes kinda fobbed me off really and said that was the only way to do it and that the building inspector signed it off. (He keeps passing it off to the building Inspector) The builder now wants to get another CCTV survey done by someone else he knows! I said fine it doesn't change...
  6. T

    Build over agreement

    Hi all/Woody, So having a look at all the conditions set by the WA the builder has i think met them. i have tried to find wherever i can about not being able to reduce in size and i cant find anything that says this. Builder was advised of all the requirements of the build over agreement and...
  7. T

    Build over agreement

    Hi all/Woody, So having a look at all the conditions set by the WA the builder has i think met them. i have tried to find wherever i can about not being able to reduce in size and i cant find anything that says this. Builder was advised of all the requirements of the build over agreement and a...
  8. T

    Build over agreement help

    Can anyone please help? (sorry this is a duplication thread with more information) I have had a provisional build over agreement from water board and had my first cctv done and submitted to the water board. Everything is now done and buildings certificate issued a few weeks ago. Question -...
  9. T

    Build over agreement

    So I have had the first survey done approving provisionally the buildover and it's the second survey that's coming up with issues.
  10. T

    Build over agreement

    Yes if only I had known this
  11. T

    Build over agreement

    Yes they did CCTV the lines on the first survey and said certain conditions must be met. But the builder has put two 110mm smaller junctions in so one side goes to the inspection chamber and the other to the toilet downstairs.(newly built) The CCTV drainage guy said because he's used a smaller...
  12. T

    Build over agreement

    Agreement states we need to replace a 150mm pipe which we have. builder has put a junction of 110mm instead of 150mm
  13. T

    Build over agreement

    I have had a CCTV survey before works and pipes were all good condition except a private pipe so that was ignored by the water board. The water board have given provisional agreement. So we've moved the manhole to outside the new building section and put an inspection chamber there. The...
  14. T

    Build over agreement

    Can anyone please help? I have had a provisional build over agreement from water board. Everything is now done and buildings certificate issued. Extension completed a month ago. Someone mentioned i need to get a cctv report after the works were complete so i have done that now but the drainage...
Back