Search results

  1. J

    Height of cracked screeded floor in new conservatory.

    I have recently had a a conservatory built. The floor was laid in two stages as they ran out of cement. They laid polystyrene and put the screed on top of this. The problem is that the gap between my interior doors threshold is only 15mm and I cannot lay the tiles I want. The floor is very...
Back
Top