  1. M

    Log Cabin Power

    ok thanks, just need to find a suitable box for the house end. will post photo of the cabin CU when fitted, for the pro's approvals
  2. M

    Log Cabin Power

    inside cabin cu
  3. M

    Log Cabin Power

    not quite long enough to reach cu indoors, i could run to the cabin cu, perhaps gland to the bottom, appears to be enough room, drilling a hole?
  4. M

    Log Cabin Power

    sorry been out all day, can someone post a pic of the boxes i need please, i want to go thru the back into wall if poss, i can run an earth from small CU rail to banjo. Thanks
  5. M

    Log Cabin Power

    many thanks for your help, thats what i will do then. i have a couple of spare locknuts so i can sandwich the banjo. cheers, just waiting for the rain to stop so i can crack on!
  6. M

    Log Cabin Power

    thanks thats what i originally planned, just concerned about the T&E coming out the bottom of the box and into the wall (in the open unprotected). would it be better to go thru the back of the box thru the walls and seal the box against the wall? Do i need special glands for the flat T&E or...
  7. M

    Log Cabin Power

    thanks for your help, but im getting more confused: this is what i have: 6mm 3core SWA 6mm T&E IP66 box x2 Garage CU 28mm Timber Wall in cabin Brick cavity house wall Hows best? Many Many Thanks
  8. M

    Log Cabin Power

    i have the ip66 boxes already thats the only reason. ill go ip66 outside with the tail thru wall into small cu if thats ok cheers
  9. M

    Log Cabin Power

    will be from main cu to the floor then along the bottom of wall all in trunking. also whats best IYHO swa thru the cabin wall then gland in small cu swa thru the cabin wall then gland in ip66 box next to small cu, long tail into small cu swa gland in ip66 box on outside cabin wall...
  10. M

    Log Cabin Power

    ok thanks, thinking about it ill stick to 20a as the cabin CU is 16a/6a Is it ok to joint 6mm 3core SWA to 6mm T&E in a IP66 Junction Box, the earth size would be different using the 3rd core of SWA and the earth of the T&E, is this ok? Many Thanks
  11. M

    Log Cabin Power

    starting this project now, is it ok to put an ip66 junction box on the side of the cabin gland the swa into it and take the tails thru the back of the box straight thru the wall into back of CU, basicly drill a hole thru the back of junction box - wall - CU with silicone between? Oh and i...
  12. M

    night latch outwards

    thanks, i got a night latch and it was as simple as unscrewing and flipping the bolt over.
  13. M

    night latch outwards

    I want to fit a night latch to my log cabin and wondered if its possible to use one on an outward opening door? Are they all adjustable if not what do i need to look out for thanks
  14. M

    Buried and covered SWA?

    thats what i thought, i doubt he had an electrician look at it
  15. M

    Buried and covered SWA?

    Been talking to some friends about my upcoming outbuilding wiring project and one told me they buried SWA just 8inches under lawn and put a scaffold board on top of it to stop spades etc hitting it :o they also said their electrician said this was fine, is that so?
  16. M

    Log Cabin Power

    Thanks for all your help, will go for 6mm buried to be on the safe side
  17. M

    Log Cabin Power

    Would it be better to put it in the RCCD side of the Main CU Heating, probaby a small electric or portable calor gas heater if required What way can i run the SWA and still get the OK from Building Control, must it be buried? what is classed as permanent?
  18. M

    Log Cabin Power

    Big fat cable wrapped in some sort of black tape coming from the ground understairs with live Neutral and a bare copper wire between the 2, does that help? I can go deeper just didnt want to disturb too many slabs, i cant clip cable to a fence post that is concreted in, but can to a cabin...
  19. M

    Log Cabin Power

    Been browsing this very useful resource for a few days now, but its now time to post a Q. Im in the process of building a log cabin in the garden and would like someone to clarify a few electric plans. First of all, yes Building Control are being informed. My plans are: 20a in Main...