Search results

  1. SkintEastwood75

    Electrical work, notifiable or not?

    Brief description of prospective work: Domestic garage, replacing 2 x GLS bulb lights, each with their own separate switch, with one fluorescent light with two-way switching. Complications: One of the existing switches is a 2-gang, and the 2nd switch bizarrely is part of two-way switching of...
  2. SkintEastwood75

    The LABC thing

    Hello. Glad to have found this site, learned a lot already, thanks! So, I'm into my 3rd year of the C&G 2330. Mate wants power in his shed to put a dryer in. I already know (having read the relevant Wiki section) that without Part P registration I have to notify the LABC prior to starting...
Back
Top