Search results

  1. M

    Is this quote reasonable?

    Would I trust an aircraft upgrade to a beginner? Yes, because it would then be inspected and tested thoroughly by an expert but the beginner would also be monitored during the entire process so point taken.
  2. M

    Is this quote reasonable?

    Thanks for all the input, I think all things considered I could install this myself but as has been mentioned installing it is only half the job, and safety is of utmost importance. Having a qualified, competent and insured professional is clearly the way to go. My concern is that I have now...
  3. M

    Is this quote reasonable?

    Thanks, that sounds good advice. I am happy to pay a fair amount for a quality job, I just don't like getting ripped off and I know there are plenty of cowboys out there who will quote way too high and a lot of people will just pay it, particularly if the guy is friendly and seems helpful...
  4. M

    Is this quote reasonable?

    Nope I don't own anything but a standard multimeter, I assumed that the Local Authority would bring theirs when they came to do their tests. Seriously how much time do you take to test one circuit with 2 double sockets and a couple lights. I do know a thing or 2 about electrical testing, besides...
  5. M

    Is this quote reasonable?

    Thanks, I was going to suggest clipping at the top of the gravel boards to the contractor. I really don't think 8 hours is unrealistic there is nothing complicated about the install. What do the regulations say about me running the cable and installing the fixtures with the contractor making...
  6. M

    Is this quote reasonable?

    Thanks for the replies, The way the quote is done it with 2 options and is written exactly as follows CONSUMER UNIT (OPTION 1 ) Supply & install 1x additional 4Way consumer unit with RCD main switch to supply 1x 32A circuit to shed, leaving 3 spare ways for future expansion. £163.50...
  7. M

    Is this quote reasonable?

    I have had a quote to replace my existing fuse box with a new CU and to run an electricity supply to my shed, its about a 40m run, I plan on running a radio, occasionally a heater and 2 2.4kw kettle elements which are used in beer making to boil the beer. This is the first quote I have...
Back
Top