Do you think this idea would be feasible:
get rid of the hedgehog, get 2 separate manifolds, 1 for the feeds and 1 for the returns with the feeds being earlier in the system, and having a smaller diameter pipe between the 2 so the hot waters easiest route is through the rads if a tstat is...