Search results

  1. A

    Energy let-through

    Hi Ya'll... I read an interesting post on here a few days ago but can't find it now!! Did not get a chance to read it all but energy let-through came up in the conversation/debate. The main topic may have been about regs compliance of some sub-mains. I was going to join the debate at the time...
  2. A

    Wiring centre for large multi-zone wet UFH system

    Hi all, I am currently re-wiring a large 6 bed manor house as part of an overall refurb. The plumber landed me with a bombshell today when he told me that he knows nothing about the electrics for the existing boiler or the new UFH system.. So yours truly has an extra job. Only just...
  3. A

    First NIC inspection (electrical domestic installer)

    Hi all, looking to you good people for some NIC advice. have been in the industrial electrical/electronics game since 1976 and yes I am older than the pyramids!! business went bad last year and I moved into the brick dust and floorboards of the domestic world. Despite having an electrical...
  4. A

    First NIC inspection.

    Sorry I posted in the wrong forum. Have moved my post to the electrics UK forum.
  5. A

    RCD not tripping at 1X 180 deg

    Hi all, I am part way through installing/testing a new consumer unit (going back tomorrow to complete the testing) Ground floor ring (2.5mm wire, 32amp MCB, Crabtree 30ma RCD) RCD test does not trip the RCD at 1X, 180 deg (negative half cycle) All other RCD tests are good including...
Back
Top