System:
I have a sealed s-plan system with boiler in loft, Grundfos 25-50 Pump + unvented cylinder in cupboard in top floor, 22mm pipework supplying 5 towel rails & about 13 traditional style rads all with TRVs.
Problem:
The system was heated with an underspec'd Worcester 18KW Ri, but this...