Thanks everyone.
I was thinking that if I isolate all but the one rad to keep, do a normal draindown and flush should tell me what trouble I have in the pipes. Seems a lot to pay £400+ for a PF when i'd only have some pipework and one rad to flush.
Maybe i'm wrong, but i'm replacing a 10...