Thanks both, I already have a DP 100a isolator after the meter, kindly installed by the DNO when they borrowed power to feed next door, during a cable issue.
So isolating the henley blocks is not an issue.
I also have already purchased spare tails, 25mm, can't cut them to length until the DP...