Thanks for that Noseall :)
I assume mild steel rod would be ok, or do I need twisted bar?
Would 0.25 inch diameter rod, inserted into the existing slab by, say, 4 inches be be sufficient do you think? (I don't currently have any longer drill!!!)
Cheers :)