  1. B

    Toilet not flushing paper

    I installed a new close coupled toilet with a 6 litre flush. The waster outlet terminates to the side with a rigid bent pan connector. The entire 6 litres does flush in to the pan yet when initially testing, it does not take away toilet paper. It’s just spins round in the bowl. There is not...
  2. B

    Drainage for downstairs toilet install

    Regs on a downstairs toilet install - New toilet located at the front of the house and the nearest drain connection is 14m away down the side of the house. The drain connection mentioned was originally a gulley serving the upstairs bath, basin and shower (1st floor side of house) and the...
  3. B

    Pipe slice prices

    I’m doing some research in to tool prices as considering starting my own tool brand and wondered what people think is reasonable price to lure them away from the main brands. So let’s say a 15mm slice and a 22mm slice, decent quality like a kopex, so not the crap that can be got on eBay. £10...
  4. B

    Reduce joist height

    Morning, I have just built a second storey extension on top of a ground floor extension (which was done 3 years ago). I’ve knocked through in to the existing bedroom and the new floor is 20mm higher than the existing. I don’t want it ramped, feathered or existing raised creating a step at the...
  5. B

    Planning for a porch

    Hi all, I want to build a timber frame porch. It’s within 2 metres of the boundary and probably over 3sqm also so I need planning. Does anyone know what application I use? Looked on my local authority site and couldn’t see what I’d have to use. Any guidance will be appreciated
  6. B

    Replacement immersion heater for unvented cylinder (Ed.)

    I’m looking for a replacement side immersion heater for an unvented cylinder. It’s the smaller threaded one (1 3/4 I believe) but the nut is around the same. All the ones I have found with that thread size the same size nut size as a standard size If I’m making any sense ….. Anyone have a link
  7. B

    Vauxhall combi 1.3 66 plate injector issue

    I had an injector spitting fuel (noticed from build of of black tar kind of substance on engine and smell in van) I had the injector washers changed and ever since the van has lacked acceleration and the kick between gears. If i now drive in a higher gear at low speed it gets a little constant...
  8. B

    Ply wood delaminated on warm deck roof

    Hi all, I built a ground floor extension 3 years ago with a warm deck roof. It was 18mm OSB, vapour membrane lapped up at all sides of 100mm rigid insulation on top. Then 18mm ply and a 3 layer felt system. I did everything bar the felting. I whilst making a material list for a second storey...
  9. B

    Combo 2016 change oil light

    The change oil service light has come on. I have oil, ands service a couple of weeks ago. how do I get the oil light off or reset the service? Can’t find it anywhere online
  10. B

    Fire stick not working on Tv

    Hi all, I have a Samsung Smart TV. It’s probably about 8-9 years old. just purchased a fire stick and it just gives a blank screen after the initial fire tv logo. I am reading it might not be HDCP compatible …..but surely all smart TVs would be….. can anyone help please
  11. B

    Summer house base and timber

    Evening, being pestered to do a summer house for a family member and have a couple of questions. Base: There is a current slab of 100mm and relatively level. Best way to begin build? I was thinking Concrete block laying on its side with a DPC underneath, then screw floor plates to them which I...
  12. B

    Ceiling insulation on Garage conversion

    Evening On a garage conversion, renewing the ceiling and have took insulation down to run cables and pipes. Wondering, Now the garage is a habitable insulated room. Ian the insulation between ceiling and 1st floor bedroom above required?
  13. B

    Loft conversion

    Have a question in regards to a loft conversion with a truss roof. Instead of steels being installed length ways between gable ends, then joists between them and supporting the roof (I think this is the normal way?) Why can’t timber joists just span the 2 outside walls and the roof be...
  14. B

    SE for triad roof design/calcs

    Any SE on here wanting a job of doing configuration for my loft conversion? Truss roof
  15. B

    Garage conversion to habitable

    I know this a how long she a piece of string question .... but what’s the price range for converting a garage in to a room. Assuming excavate and lay need foundations for brickwork and window, block and brick door opening. Fit window. Insulate roof and 3 walls, insulate and screed floor...
  16. B

    Loft conversion

    Looking to do a loft conversion. Current joists are 3inch. Between the floor and ceiling timbers I only have 1.9m . So assuming I may have to install 6 - 8 inch ?? Joists beside current ones, I would need to raise my ceiling timbers by about 400mm. So my question relating to my 1st photo is 1...
  17. B

    2nd storey rear extension

    Evening So I built a single storey rear extension. It projected 7m off the back wall to finish flush with the end of my garage. The garage wall was used as a skin of my extension and therefore classed as a side extension, so I had planning and was completing under a building notice. Now I have...
  18. B

    Salmader CT60BU

    A customer had the above pump fitted 2 years ago by swale. It’s situated in the loft with along with cold water tank, cylinder in airing cupboard below. They had problems with pump pulsating and swale could not solve it. I removed shower cartridge, cleaned debris off and run pump without...
  19. B

    Drainage

    I’m a plumber but do very little under ground drainage. My mate wants to relocate an internal stack to external. That parts not an issue, however the drain is about 1.5m below the drain cover/surface level. Can the pipe be channelled in just below surface level and dropped in to the drain or do...
  20. B

    Schedule of rates for pipework

    I have a large job to price, 5 bathrooms, UFH and new piping throughout. Does anyone use a schedule of rates for pipe per m?