Search results

  1. D

    Reflashing victorian terrace and repairing brick-on-edge coping

    Thanks for that. Once the work is done, I'm going to tidy up the front of the house so hopefully will see if anything is still coming through.
  2. D

    Reflashing victorian terrace and repairing brick-on-edge coping

    Thanks for your reply Ree and point towards the abutment flashing detail. So the new lead has to be chased in 25mm, and come out 150mm+ dressed into a low point on the profiled tile. What is the reason that stepped flashing will not work in this case, as some are still trying to sell me this...
  3. D

    Reflashing victorian terrace and repairing brick-on-edge coping

    We’re having leaks though the cement fillet flashing between the roof and parapet walls on our victorian end-of-terrace. As such, we want to replace the flashing with lead whilst at the same time patching up the top of the parapet walls themselves (brick-on-edge coping) as many of the bricks are...
Back
Top