It is a packer to bring up to height, but i was trying to add more strength and firmness.
Is it ok to add it that way around
9mm underneath then 18mm on top?
Hi there
Taking all my flooring up (T&G) and exposed the suspending floor joists.
Can i lay a 9mm OBS as a first layer and then an 18mm T&G on top?
thank you