Right, so let me get this straight...i can run a cable from the junction box/ceiling rose to the 1st light as normal, then run a cable from the first light to the 2nd light, and then from the 2nd light to the 3rd and then just stop at the 3rd?
I wasn't sure if i could do the above or had to...