The last rad. of the upstairs circuit is a drop-feed to the lower floor
(solid floor!). Rad. valves are bog-standard, c/h pump is in the return to
boiler, system vented, all other rads. properly balanced, system degunged
and inhibited so water runs clear. No air collects in rads.
This last...