Hi,
I have to raise the tray up enough to be able to get the correct fall. I have been advised to use 2x4 timber, I have to secure it to a tiled floor which I believe is concrete underneath.
Any tips on best ways to build the actual frame and allowing for the waste pipe to poke out through the wood and securing the whole thing to the floor - would be very appreciated.
Thank-you
I have to raise the tray up enough to be able to get the correct fall. I have been advised to use 2x4 timber, I have to secure it to a tiled floor which I believe is concrete underneath.
Any tips on best ways to build the actual frame and allowing for the waste pipe to poke out through the wood and securing the whole thing to the floor - would be very appreciated.
Thank-you