I'm at stage 2 in Refurbing my Bathroom.
I've recently replaced the bath with a shower cubicle and now wanting to lay a tiled floor.
The bathroom floor on the 1st floor is 18mm ply and wanting to lay 13"sq. tiles.
Should I first lay Hardboard on the floor to tile on or lay the tiles direct on the ply.