hallo,
dug 70cm x 30cm garage foundations. the floor has been covered by rubble for a year so it is well settled.
builder wants to concrete trenches and floor of the garage at the same time.
Question
is it ok to carry out work at same time? should the concrete in the trenches not dry first before the floor is laid? or would the dry concrete in the trenches not provide a key for the garage floor to be concreted later on?
your thoughts appreciated - thanks
sue
the spirit never dies
dug 70cm x 30cm garage foundations. the floor has been covered by rubble for a year so it is well settled.
builder wants to concrete trenches and floor of the garage at the same time.
Question
is it ok to carry out work at same time? should the concrete in the trenches not dry first before the floor is laid? or would the dry concrete in the trenches not provide a key for the garage floor to be concreted later on?
your thoughts appreciated - thanks
sue
the spirit never dies