Latest conservatory concern is that having built an exterior wall and an interior cavity wall up to ground level I am about to infill up to ground level with hardcore to allow the concrete floor to be poured.
My concern is that I have not built the interior wall with a reveal were the door is going to be sited, is this ok?
Obviously when the concrete floor has been poured, I will have the cavity gap alongside the door thresher. Should I rebuild the brickwork creating a reveal for the door?
Any help much appreciated. Thank you.
Thanks to all for previous help and advice.
Latest conservatory concern is that having built an exterior wall and an interior cavity wall up to ground level I am about to infill up to ground level with hardcore to allow the concrete floor to be poured.
My concern is that I have not built the interior wall with a reveal were the door is going to be sited, is this ok?
Obviously when the concrete floor has been poured, I will have the cavity gap alongside the door thresher. Should I rebuild the brickwork creating a reveal for the door?
Any help much appreciated. Thank you.