Cutting Off Upstands and DPM After screed layed

Joined
13 Dec 2022
Messages
58
Reaction score
1
Country
United Kingdom
So our flow screed was finally pumped in on Friday, I've got someone coming to sand it later this week. I've still got upstands, slip layer and dpm which are coming above the screed level (on purpose) which now need cutting flush. Will this need to be done prior to the sanding? and secondly can the dpm be cut flush with the floor or should it remain going up the wall and just be hidden behind skirting? I don't want to cut it flush and find building control have an issue with it. I might try and call my Inspector tomorrow perhaps to double check

Thanks as always
 
Sponsored Links
If the wall the screed is touching is above dpc level it should be fine cut off flush. Sanding? Is this so it can be tiled or something?
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top