I'm decorating our whole sitting room (which is v old and need a fair bit of filling etc), incl sanding/varnishing the floor (but only by hand as it's not too bad- no big electric sander)-
I've got a rough order for the jobs but don't know when I should do the floor. At the start or at the end- or somepoint in between?
I'm also going to strip this beam above the fireplace (sort of at mantlepiece height)- when should I do that- due to inevitable drips and splashes?
Rough order without these jobs is:
Prep and paint ceiling and cornice
prep and paint woodwork (minus top coat)
Prep and paint walls
Final goat woodwork
Any ideas?
Thanks
I've got a rough order for the jobs but don't know when I should do the floor. At the start or at the end- or somepoint in between?
I'm also going to strip this beam above the fireplace (sort of at mantlepiece height)- when should I do that- due to inevitable drips and splashes?
Rough order without these jobs is:
Prep and paint ceiling and cornice
prep and paint woodwork (minus top coat)
Prep and paint walls
Final goat woodwork
Any ideas?
Thanks