Hi all
Just a little advice needed please.
I am in the process of doing up my bathroom. I have had all the electrics done including wiring for an electric towel rail (I'm still in the process of deciding what I want).
Currently there is a switched FCU outside the bathroom extending to a blank plate in the bathroom approx where I want the towel rail to be. Inside the plate is just a block connector where I connect the flex of the towel rail.
Now the thing is, all this wiring has been done by an NCIECI spark and I believe he's contacted the relevant bodies. However would they need to be notified again for hooking up the towel rail to the block connector.
Likewise, when I connect a shaver socket to already notified spur? Surely I don't need another spark to come out, its just a case of screwing the wires into the pre-existing ones. All circuits protected and recorded.
Just a little advice needed please.
I am in the process of doing up my bathroom. I have had all the electrics done including wiring for an electric towel rail (I'm still in the process of deciding what I want).
Currently there is a switched FCU outside the bathroom extending to a blank plate in the bathroom approx where I want the towel rail to be. Inside the plate is just a block connector where I connect the flex of the towel rail.
Now the thing is, all this wiring has been done by an NCIECI spark and I believe he's contacted the relevant bodies. However would they need to be notified again for hooking up the towel rail to the block connector.
Likewise, when I connect a shaver socket to already notified spur? Surely I don't need another spark to come out, its just a case of screwing the wires into the pre-existing ones. All circuits protected and recorded.