fitting new Ch programmer

Joined
28 Oct 2005
Messages
14
Reaction score
0
Location
Yorkshire
Country
United Kingdom
have replaced my Landis & Gyr RWB200 CH programmer, with a Myson 2MEP 2c Dual programmer

All the settings are correct on back I.E. 'I' '7' (5/7 day) and 'P' for Pumped.
however when powering up, both CH and water came on , but no display?
non of the buttons did anything?

with mains switched off again after removal, i noticed that there wasnt a cable going to terminal 2 on the existing wall plate?
according to the user manual for the myson-this should be for CH off?
I have now put the original programmer back.

the question is, will this Dual programmer work on the original wiring?
 
Sponsored Links
unless you have a power on poweroff head you dont need to connect tot he CH off terminal and most valves return via spring
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top