OK, so I thought this would be easy. Pics show drill in line with top of other airbrick inside, but very low outside (and going through concrete explains why it was so hard!).Do I just need to dig out some of that concrete so the airbrick is below the outside ground level (and put in some sort of rain cover).
Stick shows that original airbrick in a straight line - for a moment I thought it was offset, higher outside.
Stick shows that original airbrick in a straight line - for a moment I thought it was offset, higher outside.