I have just measured up to lay a new MDPE 32mm main supply.
I have calculated I need 24.5M of pipe. Tool station supply 25M or 50M coils.
I had a look at other suppliers and it seems 25 or 50 for 32mm pipe is standard
The qustion is; will a 25M coil be at least 25M or do I buy 50M, not worry about the run lengh and suffer the wastage?
Any one ever measured a coil?
I have calculated I need 24.5M of pipe. Tool station supply 25M or 50M coils.
I had a look at other suppliers and it seems 25 or 50 for 32mm pipe is standard
The qustion is; will a 25M coil be at least 25M or do I buy 50M, not worry about the run lengh and suffer the wastage?
Any one ever measured a coil?