I've done all the grunt work and it has taken me weeks to get my soil ready for turfing. I've broken up the heavily compacted clay, added some compost to loosen it a bit, tilled it, raked it and destoned it.
I've tamped it down by walking over it, raked it again, etc., etc. My only question is this: I have stepping stones which have been set on concrete foundations and so I need to ensure that my final lawn is level with these or, presumably, ever so slightly higher. Should I ensure that my topsoil, once tamped and raked is level with the stepping stones so that the turf sits it's thickness above the stones on the basis there will be some settlement over the next few months or should I level my soil to say 1/2" below the level of the paving stones so the turf is level with them when laid.
Many thanks.
I've tamped it down by walking over it, raked it again, etc., etc. My only question is this: I have stepping stones which have been set on concrete foundations and so I need to ensure that my final lawn is level with these or, presumably, ever so slightly higher. Should I ensure that my topsoil, once tamped and raked is level with the stepping stones so that the turf sits it's thickness above the stones on the basis there will be some settlement over the next few months or should I level my soil to say 1/2" below the level of the paving stones so the turf is level with them when laid.
Many thanks.