Hello!
I recently replaced my en-suite bathroom suite. I noticed that the hot and cold feeds for the basin in were taken from the hot and cold from the bath in the next room. I kept this arrangement but altered the length of the pipes in order to move the basin in the en-suite. Since doing this the bath now takes ages to fill. What have i done to cause this as the only pipe work i altered was in the en-suite??
Cheers in advance
Tom
I recently replaced my en-suite bathroom suite. I noticed that the hot and cold feeds for the basin in were taken from the hot and cold from the bath in the next room. I kept this arrangement but altered the length of the pipes in order to move the basin in the en-suite. Since doing this the bath now takes ages to fill. What have i done to cause this as the only pipe work i altered was in the en-suite??
Cheers in advance
Tom