- Joined
- 12 Sep 2006
- Messages
- 94
- Reaction score
- 0
- Country
Hi
I'm considering moving the tap location (new bath) to the center against the wall (hate the thought but more suited), the taps currently are at the end and the pipes come straight out of the floor directly under the taps.
To move to the center I am thinking of doing the plastic push fit to try and allow for flexibility hoping it doesn't affect water flow as its gravity fed.
Any thoughts/pointers as to whats good for the job.
I'm considering moving the tap location (new bath) to the center against the wall (hate the thought but more suited), the taps currently are at the end and the pipes come straight out of the floor directly under the taps.
To move to the center I am thinking of doing the plastic push fit to try and allow for flexibility hoping it doesn't affect water flow as its gravity fed.
Any thoughts/pointers as to whats good for the job.