I am looking at moving a CU for a friend. Having SE come in tomorrow to move meter 2m and replace the meter for a new one with the DP isolator so i can work on tails safely.
My concern is the length of the existing curcuits, what if the Ring main, light circuit etc aren't long enough to reach the new position? What's the procedure? Im aware it's not right to extend those circuits with JB's!
Thanks.