Hello,
I'm going to be changing a one pipe CH system to a two pipe system. It's an S plan so i'm not going to be changing any of the controls.
Is it fairy straight forward in that I need to install the new pipework, and then tee back into the return to the boiler?
Thanks for any advice.
I'm going to be changing a one pipe CH system to a two pipe system. It's an S plan so i'm not going to be changing any of the controls.
Is it fairy straight forward in that I need to install the new pipework, and then tee back into the return to the boiler?
Thanks for any advice.